回龙抽水蓄能电站位于河南省南阳市南召县县城东北16km的岳庄村附近,距南阳市直线距离76km。电站主要建筑物包括上水库、引水发电系统、下水库等。电站厂房为地下厂房,其最大开挖跨度17.2m,长112m,高34.25m,主洞室包括主厂房、副厂房、安装间、主变室,采用“一”字型布置。引水洞最高水头580m(脉动水头),尾水洞设计水头64m。地下厂房安装两台单机容量60MW的混流可逆式水泵水轮机机组,悬式发
Huilong Pumped Storage Power Station is located in Nanyang City, Henan Province, Nanzhao County, 16km northeast of Yuezhuang Village near the northeast, away from Nanyang City, a straight line distance of 76km. The main buildings of the power station include the upper reservoir, the diversion power generation system and the lower reservoir. The underground powerhouse is an underground powerhouse with a maximum excavation span of 17.2m, a length of 112m and a height of 34.25m. The main cavern consists of the main workshop, the auxiliary workshop, the installation room and the main transformer room. Water diversion hole maximum head 580m (pulsating head), tail water hole head design 64m. Underground plant installation of two stand-alone capacity of 60MW Francis reversible pump turbine unit, suspended hair