论文部分内容阅读
开发建设项目水土保持工程概(估)算编制内所包含的各式各样的标准都由时间的推移和环境的变迁而得到一定程度的更新。针对合理利用开发建设项目水土保持工程概(估)算编制的标准,对各项费用进行了一次彻底而又明确的研究和分析。最终一致觉得,一定要做到合理的对某一种类的花销做一个编制,要想做到合情合理,就一定要使用一些正确恰当的文章和编制规则,同时还需要根据各式各样的项目的现实中的表现做一次统筹的分析与核对计算。
A wide range of standards contained in the development and construction project’s water and soil conservation project estimates have been updated to some extent by the passage of time and changes in the environment. For a reasonable use of development and construction projects of soil and water conservation project estimates (estimates) prepared by the standard, the costs were conducted a thorough and clear research and analysis. Ultimately agreed that we must make a reasonable kind of a kind of spending to make a compilation, in order to be reasonable, we must use some correct and appropriate articles and rules, but also need to be based on a wide range of projects The reality of the performance of an integrated analysis and verification calculations.