西藏果多水电站枢纽由碾压混凝土重力坝、坝身溢流表孔、左岸引水坝段及坝后厂房等建筑物组成,为西藏地区第一座碾压混凝土重力坝。设计过程中充分借鉴已建碾压混凝土重力坝的经验和教训,并结合当地高原气候条件,最终形成了电站设计的诸多特色。同时,通过工程实施过程中一系列设计优化和科研工作的开展,既提升了工程质量,又节省了工程投资。
The Tibet Jordo Hydropower Station consists of RCC gravity dam, dam body spillway, left bank diversion dam and dam building. It is the first RCC gravity dam in Tibet. During the design process, we fully draw on the experience and lessons of the built RCC gravity dam, and combined with the local plateau climatic conditions, finally formed many features of power plant design. At the same time, through a series of design optimization and scientific research carried out in the process of project implementation, not only the project quality is improved, but also the project investment is saved.