论文部分内容阅读
应澳大利亚奈特帕克公司的邀请,洛阳矿山机器厂有关人员于1988年12月初赴澳参加球磨机设计研讨会,并进行了技术考察和现场访问。 1987年洛阳矿山机器厂与澳大利亚的奈特帕克公司建立了贸易合作关系,同年10月签订了向澳出口φ3.2×4m溢流型球磨机的合同,5个月后洛阳矿山机器厂完成了设计、制造任务。1988年4月该磨机投入澳大利亚麦尔顿金矿的选矿流程,连续运转一年多,情况良好。麦尔顿金矿位于澳大利亚新南威尔士州的德雷克地区,距布里斯班约150km。选金厂设
At the invitation of Australia Knight Parker, Luoyang Mining Machinery Factory personnel in early December 1988 to participate in ball mill design seminars in Australia, and conducted a technical study and on-site visits. 1987 Luoyang Mining Machinery Factory and Australia’s Knight Parker company to establish trade cooperation in October the same year signed a φ3.2 × 4m exported to Australia spherical ball mill contract, Luoyang Mining Machinery Factory 5 months after the completion of the design , Manufacturing tasks. In April 1988, the mill was put into the beneficiation process of Australia’s Melton Gold Mine and operated in good condition for more than one year in a row. The Melton Gold Mine is located in the Drake area of New South Wales, Australia, about 150km from Brisbane. Selected gold factory