论文部分内容阅读
“三通一平”是水电工程得以施工和开展的基础,只有完成“三通一平”工程,以此来保障基本工程的开展,才能有效的保障水电站的工程开展和施工。然而,由于多方面原因,我国水电工程“三通一平”出现了一部分问题,造成了较大的环境影响和问题,极大的影响水电站建设项目的开展和周边环境的保障。本文通过对水电站“三通一平”工程及其对周边环境影响造成问题等进行分析和研究,并提出了相关的建议。
“Three links and one leveling” is the basis for the construction and development of hydropower projects. Only when the “three links and one leveling” project is completed can the development of basic projects be protected and the construction and construction of hydropower stations effectively ensured. However, due to many reasons, some problems have emerged in China’s hydropower project “three links and one leveling”, which has caused a great environmental impact and problems, greatly affecting the hydropower station construction projects and the surrounding environment. This paper analyzes and researches on the problems caused by the impact of the “three links and one leveling” project on hydropower station and its impact on the surrounding environment, and puts forward relevant suggestions.