论文部分内容阅读
10月23日至24日,珠委召开了黄茅海及鸡啼门治理规划成果讨论会,审议珠委勘测设计研究院牵头编制的《黄茅海及鸡啼门治理规划报告》(初稿)及有关单位编制的八个附件。委副主任兼总工程师李景堂,原总工程师范锦春,委副总工程师董德化及委属有关部门的领导、代表参加会议。与会者听取了设计院的《黄茅海及鸡啼门治理规划报告》及地质成果、科研所的物模试验与遥感分析成果和珠江流域水资源保护局的环评成果的汇报,并进行了认真的讨论。会议认为设计院等单位做了大量工作,规划主要成果基本符合水利部水利水电规划总院下达的规划任务书的要求,治导线规
From October 23 to 24, the Pearl Committee convened a seminar on the results of the governance of Huang Maohai and Jitie Men and reviewed the “Huang Maohai and Jitimen Management and Planning Report” drafted by the Committee of Design and Research (Draft) And the eight units prepared by the relevant annex. Deputy director and chief engineer Li Jingtang, former chief engineer Fan Jinchun, deputy chief engineer Dong Dehua and the leadership of the relevant departments, representatives attended the meeting. The attendees listened to the report of “Huangmaohai and Jitimen Management Plan” by the Design Institute and reported the achievements of geological experiment, model test and remote sensing of scientific research institutes and the results of EIA of the Pearl River Basin Water Resources Conservation Bureau, discussion. The meeting held that the Design Institute and other units have done a great deal of work, and the major achievements in planning basically conform to the requirements of the planning task book issued by the General Planning and Hydrology Department of the Ministry of Water Resources.