介绍了大伙房输水工程中4#斜井支洞长大隧道斜井施工过程中支洞断面形式、坡度长度、运输方式的选择,同时阐述了有轨出渣系统设备的选型和配套及相应主洞渣料提升系统的布置。
This paper introduces the choice of cross section form, slope length and transportation mode during the construction of inclined shaft of 4 # inclined well branch tunnel in Dahuofang water conveyance project. At the same time, Corresponding main hole slag lifting system layout.