论文部分内容阅读
1955年7月1日,黎湛铁路全线通车“一五”时期广西不是全国建设的重点,全国156个重点项目中,广西没有一项,而且广西的基建投资只占全国的1.05%。但这个时期,广西经济的发展速度仍然比较快,全国农业发展的年速度是4.5%,广西是7.8%,全国工业发展的年速度是18%,广西是18.6%。按人口
On July 1, 1955, when the railway was put into full operation, Li Zhan Railway was not the focus of nationwide construction during the “First Five-Year Plan” period. Among the 156 key projects in the country, Guangxi did not have one, and Guangxi’s infrastructure investment accounted for only 1.05% of the national total. However, during this period, the economic development in Guangxi was still relatively fast. The annual rate of agricultural development in China was 4.5% and that in Guangxi was 7.8%. The annual rate of industrial development in the country was 18% and that of Guangxi was 18.6%. By population