论文部分内容阅读
为了改进设计工作,加快勘测设计速度, 3月份,我院组织了包括副院长、副总工程师、设计总工程师、勘测室主任在内,共109人的两个设计工作组,分别到青铜峡等两个工地进行现场设计。提出设计下现场时,很多同志对这种作法有疑虑,想不通,甚至流露出一些抵触情绪。诸如有同志说:“以往现场设计失败了,这次下去也不一定有什么优越性”;有的说,“要下现场,就按产品审查制度
In order to improve the design work and speed up survey and design, in March, the institute organized a total of 109 design work teams including vice president, deputy chief engineer, chief design engineer, and surveying director, including Qingtongxia respectively. Wait for two sites for site design. When the design was put on the spot, many comrades were skeptical about this practice and could not figure it out and even showed some resistance. For example, some comrades said: ”In the past, the on-site design failed, and this time it does not necessarily have any superiority.“ Some said, ”If you want to go to the scene, press the product review system."