论文部分内容阅读
阐述了高层建筑混凝土结构转换层施工的技术要点,从混凝土强度、养护管理、温度监控三方面,探讨了该结构转换层施工的裂缝控制措施,从而确保高层建筑转换层质量。
The technical points of the construction of the transfer floor of the high-rise building concrete structure are expounded. The control measures of the construction of the transfer floor are discussed in terms of concrete strength, maintenance management and temperature monitoring so as to ensure the quality of the transfer floor of the high-rise building.