介绍了神华国能宁夏鸳鸯湖电厂二期扩建工程应用液压顶升平桥成功解决双曲线间冷塔施工过程中人员上下工作面、材料垂直运输、混凝土泵送等难题,保证了工期。
This paper introduced the application of hydraulic jacking bridge to the second phase expansion of Shenhua Guoyun Yuanyangghu Power Plant in Ningxia and successfully solved the problems of upper and lower working faces, vertical transportation of materials and concrete pumping during the construction of hyperbolic cold towers and ensured the construction period.