伊洛河河线较长,历史上河道未进行系统治理,且多处河道两岸为不同的行政区域管辖,受地形地貌等因素制约而形成河道卡口,这些卡口河段是流域水系中影响河道防洪的一大隐患。文章针对黑石关卡口河段拟定处理方案进行防洪影响和投资分析,推荐河道卡口扩宽方案,但治理措施需要相关部门共同处理,综合考虑各种制约因素,及早消除防洪安全隐患。
The Yiluo River has a long river course. Historically, the river courses have not been systematically managed and the cross-strait areas of the rivers have jurisdiction over different administrative regions. Due to the topography and other factors, the river mouths are formed. These bayou sections are affected by the river system Flood control of a major risk. The paper proposes a plan for flood control and investment promotion for the planned treatment scheme of Blackstone Guankaikou, and recommends a plan for widening bayonets of the river. However, the treatment measures need to be jointly handled by the relevant departments. Various control factors should be taken into consideration in order to eliminate hidden dangers of flood control as soon as possible.