三峡工程右岸一期导流明渠担负着二期导流及施工期通航任务,工程包括混凝土纵向围堰、三期RCC围堰一期工程及上下游航道整治。工程由长江委设计院设计,长江葛洲坝集团公司承包施工,工程监理为长江委三峡工程监理部。根据三峡右岸一期工程建设监理合同,监理部设立了一期导流
The Phase I diversion channel on the right bank of the Three Gorges Project is responsible for the second phase diversion and navigation tasks during the construction period. The project includes concrete longitudinal cofferdam, phase I RCC cofferdam phase I project and upstream and downstream channel regulation. The project was designed by the Yangtze River Commission Design Institute, the Yangtze River Gezhouba Group contracted construction project supervision for the Yangtze River Commission Three Gorges Project Supervision Department. According to the construction contract of the first phase project of the Three Gorges Right Bank, the Ministry of Supervision set up a phase of diversion