在1958年大跃进的基础上,1959年水电站机电安装工作,也和全国各个建设部门一样,飞跃前进,取得了伟大的成绩。一年来安装机组总容量为全年计划的131%,为1958年装机容量的二倍多,为第一个五年计划装机容量的70%。这一成绩的获得是由于党的正确领导,水利电力部党组及各级党组织对安装工作的重视,党委书记亲自挂帅 On the basis of the Great Leap Forward in 1958, the electromechanical installation of the hydropower station in 1959, like all construction departments in the country, has leapt forward and achieved great results. In the past year, the total installed capacity of the units was 131% of the annual plan, which was more than double the installed capacity in 1958, which was 70% of the installed capacity of the first five-year plan. This achievement was due to the party’s correct leadership. The party group and the party organizations at all levels of the Ministry of Water Resources and Electric Power paid attention to the installation work. The party secretary personally took command of the party.
其他文献
国际电工委员会(IEC)第47届年会于1982年5月31日至6月12日在巴西里约热内卢举行。年会期间“低压设备绝缘配合分技术委员会”(SC28A)于6月2日至4日也召开了会议。经国家标准
本文对Alcan Smelters and Chemicals股份有限公司的魁北克动力系统中装有单相自动重合闸和远方的跳闸的双回345kv输电线路作了叙述。报告和评论了重合闸装置工作13年来的性
在周内外一派大好形势下,我国人民满怀豪情,迎来了伟大历史性转变的一九七九年。 党的十一届三中全会一致同意华国锋同志代表中央政治局提出的决策:要在新时期总路线和总任
山东省机械局受一机部机床局委托,于一九七八年十二月二十四日至二十七日在济南召开“提高600/3600吨铰式六面顶液压机同步、保压性能的研究”成果鉴定会。参加会议的有主管
在举国欢腾庆祝我们伟大祖国建国十周年的时候,天津电业系统,涌现出一支朝气蓬勃、具有高度现任感、坚决保证安全发供电的生力军——1713名安全生产红旗手。这支占全体职工3
苟滩地处长山的一隅。在来安县城东北,有山曰:五湖山,又名曰:白禅山。广裹二十里,俗称二十里长山,苟滩就在它的腹地之中。在《方舆纪要》中记:“山有涧道,控扼南北,至为险要。”又曰:山上有双鹤庙,石砌而成,拾级而上,五湖美景尽收眼底。在白禅山麓有一古老的村落——苟滩村。据载,村前曾有五湖,湖水清沏,似有明镜嵌在白禅山上,湖在山上,山映湖中,烟雾缭绕,景物秀丽。明人尹梦壁《五湖环秀》诗云:“绿杨芳草带平
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
2月21日至3月1日在北京举行了全国电力工业会议。开幕那天,水利电力部李葆华副部长以“在连续两年大跃进的胜利基础上,为1960年电力工业的继续跃进而奋斗”为题,作了重要报
1960年,我厂在党的正确领导下,在总路线的光辉照耀下,自元月份开始,就开展了一个轰轰烈烈的以机械化和半机械化为中心的技术革新和技术革命群众运动,这一运动的特点,是发动
盐锅峡水电站是在党的总路线的光辉照耀下,和甘肃省委、工程局党委的正确领导下,全体职工解放了思想,破除了迷信,以敢想敢干的共产主义风格,在物质条件极端困难的情况下,用