中吉乌铁路(全称中国—吉尔吉斯斯坦—乌兹别克斯坦铁路)项目,最终路线设计为:起自中国新疆的喀什站,经中国与吉尔吉斯斯坦边境的伊尔克什坦吐尔尕特山口,再经吉尔吉斯斯坦境内的卡拉苏,终至乌兹别克斯坦的安集延。铁路全长约504公里,其中中国境内175.9公里,吉尔吉斯斯坦境内
The final project of the project of the Central China-Uzbekistan Railway (the “China-Kyrgyzstan-Uzbekistan Railway”) is designed as follows: Kashgar Station from Xinjiang, China, the Irkeshtatul Tartar Pass on the border between China and Kyrgyzstan, Karasu in the territory of Stan and finally to Andijan in Uzbekistan. The railway is about 504 kilometers in length, of which 175.9 kilometers in China and Kyrgyzstan