在短段砌壁整体金属模板施工中,调平找正比较困难,主要的原因是模板悬吊绳(一般是三根以上)很难保证同步给绳。即使稳车型号、绳径都相同,且采用“集控”也达不到理想的同步给绳。如果给绳不同步,会造成模板受力不均和下放困难。受力不均会发生变形,这样模板的外形轮廓尺寸就难予满足井筒规格的要求。一旦操作失误,还容易造成模板变形甚至毁坏模板。因此,正确解决给绳同步问题,是用好整体金属模板的关键问题。
In the short segment of the wall overall metal template construction, leveling is more difficult to find, the main reason is the template suspension rope (usually more than three) is difficult to ensure synchronization to the rope. Even steady vehicle models, rope diameter are the same, and the use of “set control” can not reach the desired synchronization to the rope. If the rope is not synchronized, will result in uneven stress and decentralization of the template. Inconsistent with the force will be deformed, so the contour shape of the template will be difficult to meet the requirements of wellbore specifications. Once the operation is wrong, but also easily lead to template deformation or even destroy the template. Therefore, the correct solution to the issue of rope synchronization is to make good use of the overall metal template key issues.