多年来,江苏省防汛岁修经费和汛期急办工程经费大都要到当年春天才层层下达,到大汛之前才能安排到具体工程开工。结果由于劳力紧张,加之大汛前河湖水位高涨,农作物灌溉用水高峰到来,往往带来土方、护坡、防渗、抛石、工程加固等方面施工困难,影响了防汛工程进度和质量,有的项目甚至拖到汛后才能去办。为了改革这一传统作法,真正发挥这两项经费的实效,在全国增
Over the years, most of the funds for flood prevention and flood control in Jiangsu Province and the funds for emergency projects in flood season have been mostly issued in the spring of that year. Only by the time of the flood season can concrete projects be started. Results As a result of labor shortage and the rising water level of rivers and lakes before the flood season, crop irrigation water arrives at the peak, often resulting in construction difficulties such as earthwork, slope protection, seepage prevention, riprap construction and engineering reinforcement, affecting the progress and quality of flood control projects. Even after the project is towed into the flood season, it can be handled. In order to reform this traditional approach, the real effectiveness of these two funds has been fully realized and increased throughout the country