顶部水泥脉冲振动是在复杂地质条件下固井预防气窜的一项新技术 ,它能延缓水泥浆的静水压头损失 ,有效预防固井中的气窜 ,改善水泥胶结测井条件 ,并提高固井质量。应用这项技术的关键在于顶部水泥脉冲振动设备 (空气压缩机和空气脉冲发生器 )参数的控制。为此 ,讨论了顶部脉冲振动波动方程、边界条件及初始条件与顶部设备输出参数的相互调节关系 ,为在油田的推广应用该项技术提供了理论依据。解决顶部水泥脉冲振动设备输出参数控制问题的难点是必须保证水泥浆静水压力与脉冲压力之和大于地层孔隙压力 ,才能实现防止复杂地层油气水窜的目标。
Top of the cement pulse vibration is a new technology to prevent gas channeling in cementing in complex geological conditions, it can delay the hydrostatic head loss of cement slurry, effectively prevent the gas channeling in cementing, improve cementing logging conditions, and improve Cementing quality. The key to applying this technology is the control of the parameters of the top cement pulse vibration equipment (air compressor and air pulse generator). For this reason, the relationship between the top pulse vibration fluctuation equation, the boundary conditions and the initial conditions and the output parameters of the top equipment are discussed, which provides a theoretical basis for the popularization and application of this technology in the oil field. The difficulty of solving the output parameter control problem of the top cement pulse vibration equipment is that it is necessary to ensure that the sum of the hydrostatic pressure and the pulse pressure of the cement slurry is greater than the pore pressure of the formation to achieve the goal of preventing channeling of oil and gas in the complex formation.