南水北调东线穿黄探洞工程 ,在黄河水面以下 70m深处的岩层中穿越黄河 ,工程区内岩溶发育 ,三水 (黄河水、覆盖层潜水、岩溶地下水 )相通 ,探洞于 1 988年 1月竣工。 1 999年 8月 30日上午 ,进行日常排水作业时发现探洞水仓水泵房北侧岩壁涌水 ,采用钻孔注浆堵水措施进行封堵取得了成功。
Yellow River caverns penetrated East Route of South-to-North Water Diversion Project. They crossed the Yellow River in the rock formations at a depth of 70m below the water surface of the Yellow River. Karst development occurred in the project area and Sanshui (Yellow River water, overburden diving and karst groundwater) Completed in January. On the morning of August 30, 1999, during the daily drainage operation, it was found that the gushing water in the northern side of the pump house in the cavern watercourse was successfully sealed by the grouting and blocking measures by drilling grouting.