论文部分内容阅读
分析了地铁与行人隧道近距离盾构施工时的相互影响,介绍了为治理相互影响而采取的技术、管理措施及治理实效。
The interaction between subway and pedestrian tunnels in shield tunnel construction is analyzed. The technical measures, management measures and effective measures for controlling mutual effects are introduced.