我厂铸工车间小件清砂,长期来靠手工操作。由于劳动强度大,操作场地小,周围又堆放热铸件,劳动条件十分恶劣,灰尘浓度较大,对身体健康有一定的影响。在无产阶级文化大革命的推动下,引起了厂党委的重视,从1971年起组织了由工人、技术人员和领导干部参加的三结合战斗组,自行设计制造了一条小件清砂生产线,于1973年4月中旬正式投产。经过一年多的生产实践证明,基本上达到了减轻劳动强度、改善劳动条件、提高劳动生产率的
I plant casting workshop small pieces of sand, long-term to rely on manual operation. Due to the high labor intensity and small operation site, there are also hot castings around them. The working conditions are very poor and the dust concentration is relatively large, which has a certain impact on the health of the people. Driven by the Great Proletarian Cultural Revolution, it attracted the attention of the factory party committees. Since 1971, a three-in-one battle group with workers, technicians and leading cadres has been organized to design and manufacture a small sand production line. In 1973, In mid-April formally put into operation. After more than a year of production practice has proved that basically to reduce labor intensity, improve working conditions, improve labor productivity