论文部分内容阅读
一、供电分会2002年度工作总结在中联的直接领导下,在广大会员单位的大力支持下,年初以来,我们坚持以“三个代表”的重要思想为指针,以改革为主线,与时俱进、开拓创新、以实为本地开展分会工作,圆满地完成了2002年的各项工作任务。现就基本情况汇报如下: (一) 突出改革主线,搞好超前调研今年3月,我们得知国务院《电力体制改革方案》下发的信息后,主动学习文件精神,通过学习逐步认识到,改革要坚持“三个有利于”、“两个稳定”的基本原则;积极稳妥、配套推进、总体部署、分步进行的实施步骤;建立市场机制、形成电价机制等改革要点,都是贯穿电力体制改革全过程的,供电企业改革也是其中的重要环节和组成部分。特别是文件中指出的“有关电力设计、修造、施工等辅助性业务单位,要与电网企业脱钩,进行公司化改造,
I. Summary of the Annual Work of the Power Supply Branch in 2002 With the strong support of the majority of member units and the strong support from the majority of member units, since the beginning of the year, we have adhered to the guiding principle of ”three represents,“ guided by the principle of reform and Keeping pace with the times, pioneering and innovating, they carried out the club work in a solid manner and successfully completed all the tasks in 2002. We hereby report on the basic situation as follows: 1. Highlight the main line of reform and do a good job of research ahead of schedule In March of this year, after learning the information issued by the State Council on the ”Electric Power System Reform Plan,“ we actively read the spirit of the document and gradually realized through the study that the reform We must uphold the basic principle of ”three benefits“ and ”two stability“; actively and steadily promote the implementation of the overall deployment and step by step; establish the market mechanism and form the reform points of the electricity price mechanism, etc. Throughout the entire process of power system reform, power supply enterprise reform is also an important part and an integral part of it. Especially pointed out in the document ”Auxiliary business units, such as electric power design, construction and construction, should be decoupled from the power grid companies, carry out corporatization transformation,