A method to refine the start-up scheme of compression and refrigeration systems in ethylene plants v

来源 :Chinese Journal of Chemical Engineering | 被引量 : 0次 | 上传用户:hngscg
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Starting the cracking gas compressor and precooling the refrigeration system are keys to start-up of an ethylene plant and accounts for up to 50% of the total start-up time and plant flare emissions. Premature feeding of cracking furnaces can be avoided if the cracking gas compressor is started and the refrigeration system is precooled in advance using mixed gas as the start-up working medium(SWM). Start-up scenario with mixed gas as SWM could significantly reduce the emission loss and shorten the precooling time. Research shows that making appropriate start-up scheme is important not only to ensure operational safety and feasibility, but also to reduce energy consumption. In this paper, a method is proposed to select suitable start-up operational parameters of compression and refrigeration system with sufficient safe operating ranges and short precooling time. The complex interrelation among key parameters of start-up is analyzed. It is found that higher energy consumption, especially for super high-pressure steam(SS), can promote operational safety and shorten the precooling time during start-up.Based on steady-state and dynamic simulation, appropriate operating parameter ranges are determined with reasonable SS consumption. A real case study demonstrates that an appropriate start-up scheme will optimize the operation. Starting the cracking gas compressor and precooling the refrigeration system are keys to start-up of an ethylene plant and accounts for up to 50% of the total start-up time and plant flare emissions. Premature feeding of cracking furnaces can be avoided if the cracking gas compressor is started and the refrigeration system is precooled in advance using mixed gas as the start-up working medium (SWM). Start-up scenario with mixed gas as SWM could significantly reduce the emission loss and shorten the precooling time. Research shows that making appropriate start-up scheme is important not only to ensure operational safety and feasibility, but also to reduce energy consumption. In this paper, a method is proposed to select suitable start-up operational parameters of compression and refrigeration system with sufficient safety operating ranges and short precooling time. The complex interrelation among key parameters of start-up is analyzed. It is found that higher energy consumption, especially for super high-pressure steam (SS), can promote operational safety and shorten the precooling time during start-up. Based on steady-state and dynamic simulation, appropriate operating parameter ranges are determined with reasonable SS consumption. A real case study demonstrates that an appropriate start-up scheme will optimize the operation.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
本文通过对荣华二采区10
期刊
既往报道 ,注射用血塞通 (冻干 )多用于治疗心脑血管疾病 ,作者根据其有效成分可针对胃溃疡(GU)的一些病因及病机 ,通过有效地削弱攻击损伤因素、加强防御保护因素等药理作用
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
目的:分析引起食物中毒的原因。方法:结合现场卫生调查、流行病学调查以及实验室检测对中毒事件的原因进行分析。结果:此事件初步认定是一起由酒店聚餐导致的原因不明的细菌
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
Three types of ligands have been developed for copper-catalyzed Ullmann cross coupling reaction of bromaminic acid with amines in aqueous solution. Ligands with
无雪的冬天  是不完整的  无雪的冬天  到处,是错别字  枯寂的草木  昏黄的墙垛  僵硬的表情  连鸟儿的叫声  也缺斤少两
以往认为急性胰腺炎是内镜下逆行胰胆管造影(ERCP)的禁忌证 ,随着内镜设备的完善及ERCP、十二指肠乳头切开术 (EST)、经内镜鼻胆 (胰 )管引流术[ENB(P)D]等相关技术的进步和