论文部分内容阅读
介绍秦沈客运专线A2标段高填方堤堑交界处路堤与路堑过渡段施工技术 ,提出了路基由刚性构筑物向柔性构筑物过渡的处理措施
This paper introduces the construction technology of the embankment and the cutting transitional section of the embankment at the A2 section of Qin-Shen Passenger Dedicated Line, and proposes the treatment measures for the transition from rigid structure to flexible structure