论文部分内容阅读
西单大悦城工程为一大型公建项目,结构体系为混凝土框架-剪力墙结构。在主体结构施工完成后项目竣工前,由于业主方对项目的市场定位及使用功能改变,相应外立面、建筑功能以及使用荷载均发生非常大的变化,相应带来结构主体、局部的多处加固改造。本文对该项目有关加固改造部位的实际情况、要求以及采取的相应加固改造手段等做简要阐述,以供同类设计参考。
Xidan Joy City project is a large-scale public construction project, and its structural system is concrete frame-shear wall structure. Before the completion of the main structure construction, due to changes in the market positioning and use of the project by the owner, the corresponding facades, building functions and use loads have undergone tremendous changes, resulting in the main body of the structure and local parts Reinforcement. This article gives a brief exposition on the actual conditions and requirements of the project, as well as the corresponding measures to be taken to reinforce and remodel the project for reference of similar design.