论文部分内容阅读
本文结合南海石化项目引堤采用强夯挤淤代替挖泥的实践,重点介绍强夯参数的确定,施工方法及强夯效果。
In this paper, the practice of strong ramming in place of dredging instead of dredging is introduced in the South China Sea Petrochemical Project. The determination of dynamic compaction parameters, construction method and dynamic compaction effect are mainly introduced.