论文部分内容阅读
确定容量是水电站設計中最重要的一个部分。各水电站的經济效益正如其他社会主义企業一样,是各不相同的,它取决于所选容量的大小。設計水电站容量及其机組投入运轉的程序时,务必使尽可能地充分利用水力资源与最小地积压投资达到最好的结合。大
Determine capacity is the most important part of the design of hydropower station. The economic benefits of hydropower stations are just as different as those of other socialist enterprises and depend on the size of the selected capacity. When designing the capacity of hydropower stations and the procedures for putting them into operation, it is imperative that the best combination of hydropower resources and minimum backlog investments be used as much as possible. Big