某输气管道建成后采用空气进行强度试压,其试验压力为8.0MPa,当压力升到4.3MPa时发生漏气。为搞清管道漏气原因,笔者对管道漏气情况和施工情况进行了调查研究,对漏气管道取样进行了试验分析。 1 管道及焊接基本情况该输气管道所用管线管规格为φ610mm×10mm,钢级为X60。管道对接焊缝采用下向焊接工艺焊接。在焊接过程中采用FOX CEL φ3.2mm焊条打底。再用E71T8-Ni1焊丝填充和盖面。该对接焊缝错边为2.0mm,超过标准规定值(≤1.6mm)。对接焊缝开裂的管段埋深约3m,管线下沟回填
After the completion of a gas pipeline using air pressure test, the test pressure of 8.0MPa, when the pressure rose 4.3MPa leak occurred. In order to find out the cause of the pipeline leakage, the author conducted a survey on the condition of the pipeline and the construction situation, and conducted the test analysis on the sample of the gas leakage pipeline. 1 The basic situation of pipelines and welding Pipelines used for the gas pipeline specifications for φ610mm × 10mm, steel grade X60. Pipe butt weld using the next welding process. In the welding process using FOX CEL φ3.2mm electrode primer. Re-E71T8-Ni1 wire filler and cover. The butt weld the wrong side of 2.0mm, exceeding the standard value (≤ 1.6mm). Butt weld cracked pipe buried depth of about 3m, pipeline ditch backfill