为了保证电机工业高速度发展,我科同志鼓足干劲,力争上游,大大地缩短了设计周期。现在,一般中小型厂房的土建施工图在接到任务后六天以至更短的时间内就可以完成全部土建施工图的设计。但是,对于重型厂房能否打破常规,大大缩短设计周期,不久前还有不少同志表示怀疑。重型厂房的吊车吨位大,厂房高,构造复杂,建筑与工艺和公用的关系密切,受施工条件的限制多,要缩短
In order to ensure the high-speed development of the motor industry, our comrades are working hard to strive for the upper reaches and greatly shorten the design cycle. Now, the civil engineering drawings of small and medium-sized factories can complete the design of all civil construction drawings within six days or even less after receiving the task. However, there are many comrades who expressed doubts about whether or not heavy-duty workshops can break the routine and shorten the design cycle. Heavy-duty workshops have large crane tonnage, high workshops, complex structures, and close relationship between construction and technology and public utilities. They are limited by construction conditions and must be shortened.