重型厂房的土建设计速度是如何跃进的

来源 :机械工厂设计 | 被引量 : 0次 | 上传用户:WIN_Hardy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
为了保证电机工业高速度发展,我科同志鼓足干劲,力争上游,大大地缩短了设计周期。现在,一般中小型厂房的土建施工图在接到任务后六天以至更短的时间内就可以完成全部土建施工图的设计。但是,对于重型厂房能否打破常规,大大缩短设计周期,不久前还有不少同志表示怀疑。重型厂房的吊车吨位大,厂房高,构造复杂,建筑与工艺和公用的关系密切,受施工条件的限制多,要缩短 In order to ensure the high-speed development of the motor industry, our comrades are working hard to strive for the upper reaches and greatly shorten the design cycle. Now, the civil engineering drawings of small and medium-sized factories can complete the design of all civil construction drawings within six days or even less after receiving the task. However, there are many comrades who expressed doubts about whether or not heavy-duty workshops can break the routine and shorten the design cycle. Heavy-duty workshops have large crane tonnage, high workshops, complex structures, and close relationship between construction and technology and public utilities. They are limited by construction conditions and must be shortened.
其他文献
钢筋混凝土结构屋盖,目前在跨度大些的建筑上大都采用钢筋混凝土桁架(或薄腹梁),加钢筋混凝土桁条、机平瓦或大型屋面板等,耗材较多。在单层工业建筑中,屋盖的造价约占整个
过去,机械化运输设计存在着三个主要缺点:即图纸张数多、设计时间长、质量差。以年产15000吨铸件的铸铁车间为例,除去标准图外,还有10大本非标准部分的施工图,约合300张标准
关于国际友人与中国抗战之研究北京大学张注洪在抗战史研究中,国际友人与中国抗战是中外学者关注和重视研究的课题。建国后,特别是近十多年来,有关此课题的系统资料和研究论述多
《伊玛堪》是黑龙江省的非物质文化遗产,已被联合国教科文组织列入《急需保护的非物质文化遗产名录》。伊玛堪作为一种讲唱文学,是赫哲族的原生态文学,是这个民族的原始社会
清同治四年、五年,即1865、1866年,时任清政府海关总税务司的英国人赫德(Robert Hart,1835—1911),和时任英国驻华使馆参赞的威妥玛(Thomas F.Wade,1818—1895),先后向清政
唐才常入两湖书院时间考实郭汉民,陈宇翔唐才常曾在湖北两湖书院学习过,这段时间的学习是他的思想从传统旧学转向变法维新的重要阶段。目前史学界都认为唐才常入两湖书院学习的时间是1894年春,即甲午战争爆发以前。《唐才常集》的编者在该书《前言》中说唐才常“1...
砚期负通廊墙皮析架横向稳定的特殊构造措施··…12一47钢管基础托换·············,···················……12一49 趁筑工粗的科学管理方
“工欲善其事,必先利其器”。我国35年来的建设经验,从正反两个方面充分地证实了这句名言。这与马克思关于“社会生产的变化和发展是从生产工具的变化和发展开始的”的论断