论文部分内容阅读
铁道部第十一工程局,为根治经济效益滑坡,决心战胜困难,摆脱困境,采取加强投标的辐射度,搞好项目开发拓展,以路为主,广泛经营。因当前主要矛盾是任务不足,承揽的工程项目单一、结构单一,因而形成土石方量大,土方机械倍感紧张不足。但其它机械,如自动化混凝土拌合台,处于停机没活干的
The 11th Engineering Bureau of the Ministry of Railways, in order to eradicate the decline in economic efficiency, is determined to overcome difficulties, get rid of the predicament, take measures to strengthen the radiology of bids, do a good job in project development and expansion, take the road as the main, and operate extensively. Because the current major contradiction is the lack of tasks, the engineering projects contracted are single and the structure is single. As a result, large amounts of earth and stone are formed, and the earth-moving machinery is often under strained. However, other machinery, such as automated concrete mixing stations, did not work during shutdown.