论文部分内容阅读
1994年,水利系统在水电及农村电气化建设事业又开创了新局面: ——水电建设加速发展。在1994年,水电建设的规模和投入均是解放以来的最大的,在建项目总装机达1050万kW,为1993年底全国水利系统拥有总装机容量2016万kW的1/2,其中中小水电732万kW,超过在建规模的2/3;全国水电投资规模超过110
In 1994, the water conservancy system created a new situation in the construction of hydropower and rural electrification: - The accelerated development of hydropower construction. In 1994, the scale and investment of hydropower construction were the largest since the liberation. The total installed capacity of the projects under construction reached 10.5 million kW. By the end of 1993, the national water conservancy system had a total installed capacity of 2016 million kW, of which 264 were medium and small hydropower stations. 10,000 kW, more than 2/3 of the scale under construction; the scale of national hydropower investment exceeds 110