桂林盛海广场在地下室施工完成后,因其上部结构使用功能由7层商场改变为高层住宅,为了增大结构刚度、减少加固梁柱数量,结构形式由框架结构改为框架剪力墙结构,需对部分地下室基础、梁、板和柱进行加固。通过计算分析,选取了较适合的加固方法,筏板基础采用加大截面法,地下室顶板采用粘贴碳纤维布加固、梁柱采用外包钢加固,并用高压喷射注浆法加固地基。
Guilin Shenghai Square after the completion of the construction of the basement, because of the use of the structure of its superstructure from 7-storey mall into high-rise residential buildings, in order to increase the structural rigidity and reduce the number of reinforced beams and columns, the structure of the structure from the frame structure to frame shear wall structure, Part of the basement, beams, slabs and columns are to be reinforced. Through the calculation and analysis, a more suitable reinforcement method is selected. The raft foundation is enlarged with the cross-section method. The basement roof is reinforced with bonded carbon fiber cloth. The beam columns are reinforced with outsourcing steel and the foundation is reinforced with high-pressure jet grouting method.