论文部分内容阅读
第一冶炼厂担负着金川公司中间产品一次高冰镍、铜阳极板、富钻冰铜和制酸烟气的生产任务,系火法冶炼单位,生产环境差、粉尘浓度大、有害气体多、设备管网点多.共有设备2238台(套).工艺管网138213米、阀门14515个,动、静密封点214892个.为了扎扎实实,一步一个脚印地搞好“无泄漏工厂(车间)”的创建活动,厂领导班子多次召开专门会议,研究制定了全厂创建“无泄漏工厂(车间)”活动的总体安排,建立了由党政领导总体指挥、设备副厂长分工负责、机动科室具体实施、有关科室参加的领导网络,负责对全厂创建“无泄漏工厂(车间)”活动的领导、指挥、检查和验收.各个部门在布置工作中,均有创建“无泄漏工厂(车间)”活动的安排与要求.1995年厂长方针目标中又明确提出了把第一冶炼厂创建成为“无泄漏工厂(车间)”,并开展了有声有色的宣传,给创建“无泄漏工厂(车间)”活动营造了强烈的气氛;得力的措施,给“无泄漏工厂(车间)”创建活动注入了活力.
The first smelter is responsible for the production of intermediate products of Jinchuan company with a high iced nickel, copper anode plate, rich matte and acid-flue gas production. It is a pyromanufacturing unit with poor production environment, large dust concentration, many harmful gases, equipment pipe A total of 2238 units (sets). Process pipe network 138,213 meters, the valve 14515, moving, static sealing point 214892. In order to be solid, step by step to improve the “leak-free factory (workshop)” Create activities, the factory leadership held a number of special meetings to study and formulate the entire plant to create a “leak-free factory (workshop)” the overall arrangements for the establishment of the party and government leaders under the overall command of the deputy director of the division of labor responsible for the motor department specific Implementation and leadership departments attended by the departments concerned were responsible for the leadership, command, inspection and acceptance of the entire plant to create a “leak-free factory (workshop).” All departments had set up a “leak-proof factory Activities and arrangements for the requirements 1995 goals of the director also made it clear that the first smelter to create a ”leak-free factory (workshop)“ and carried out an impressive publicity to create ”no vent Factory (Workshop) “activities to create a strong atmosphere; the measures are effective, for” no leakage factory (workshop) "to create activities injected vitality.