江苏南部湖成因演化再研究

来源 :江苏地质 | 被引量 : 0次 | 上传用户:goubo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
记述了湖的基本特征,讨论了全新世镇江海侵对湖的影响,根据全新世各时期沉积物的分布,阐明了湖湖岸的变化;依据古生物与人类活动遗迹资料,指出湖演化发展可分为3个阶段,即距今10000a~6000a为雏形阶段,距今6000a~2000a为发展阶段,距今2000a以来为现代湖成形阶段。究其成因为新构造活动—河道淤塞—人工改造而成。 The basic characteristics of the lakes and lakes are described. The influence of the transgression of the Zhenjiang River to the lakes and lakes is discussed. Based on the distribution of the sediments at various periods of the Holocene, the changes of lakes and lakes are clarified. According to the paleontological and human activities, Evolution and development can be divided into three stages, that is, 10000a ~ 6000a dating from the embryonic stage, dating from 6000a ~ 2000a for the development stage, dating back to 2000a since the formation of modern Laguna Lake. The reason for the new tectonic activity - the river blockage - made from artificial transformation.
其他文献
近日,由上海市地质调查研究院完成的《上海外高桥造船基地地质灾害危险性评估报告》,经省级地质矿产行政主管部门——上海市地质矿产局认定,已作为该工程审查报批的附具材料
变质地体是国内外金矿床集中分布区。综述了已建立的成矿模式,包括花岗-绿岩带成矿模式、多阶段多成因模式、地壳连续成矿模式、中酸性岩浆和基性、超基性、岩浆深源混合成矿模
Test results show that the settlement process of model piles is mainly the rheological process of frozen soil under shear loading. The settlement rate of model
分析了影响学生学习英语主动性的几个因素,提出了诱发学生的学习兴趣参与学习的途径,认为教师应考虑从兴趣入手,激活英语教学,让学生主动学习。
创新高职英语教学不是一个孤立的问题,更不是可有可无的事情。21世纪是日益趋向交流与合作的时代,英语在国际交流中的地位日益突显,已成为时代发展对现代人基本素质的要求。
A fully integrated high linearity differential power amplifier driver with an on-chip transformer in a standard 0.13-μm CMOS process for W-CDMA application is
Electrical properties of In_x Al_(1-x)N/AlN/GaN structure are investigated by solving coupled Schr(o|¨)dinger and Poisson equations self-consistently.The varia
A phase-locked loop(PLL) frequency synthesizer with a novel phase-switching prescaler and a high-Q LC voltage controlled oscillator(VCO) is presented.The phase-
针对光反馈半导体激光器接收系统微分方程组非线性的特点,根据龙格-库塔算法的思想和模型中的特点,提出了对当前迭代式中所需要的之前斜率值的估计算法,并对发射与接收信号进
对采矿成本中的可变部分进行了系统的分析,提出了降低铁矿石成本的技术措施 A systematic analysis of the variable part of mining costs was made and technical measures