论文部分内容阅读
以虎门悬索桥施工为依托,着重介绍灰色预测控制在主缆架设阶段的具体应用方法及控制效果。主要内容有:实桥温度修正曲线的建立;观测数据序列及相应的GM(1,1)模型的选定;基准索股标高预测稳定值的确定等。
Based on the construction of Humen Suspension Bridge, the application and control effects of gray predictive control on the erection of the main cable are emphatically introduced. The main contents include: the establishment of real bridge temperature correction curve; the observation data series and the corresponding GM (1,1) model selection; the benchmark stock price elevation forecast stability value determination and so on.