荆江分洪南闸加固改建工程初步设计于1964年10月完成,并于11月下旬开工。设计革命运动开展以后,我们发动群众进行了鸣放检查,并组织工作组到现?进行调查研究,开展技施设计。在反复学习了主席的著作,提高了思想的基础上,对原初步设计中不合理的部分进行了修改。初步统计,几项主要工程量较初步设计平均节约了三分之一左右,预计至少可以减少工程造价57万元。
Jingjiang flood diversion South Gate project to strengthen the reconstruction of the preliminary design completed in October 1964 and started in late November. After the design revolutionary movement was carried out, we mobilized the masses to carry out the check-out of mines and organized the working groups to carry out investigations and studies and conduct technical design. After repeatedly learning the chairman’s work and raising his thinking, the unreasonable part of the original design was revised. According to preliminary statistics, the average cost of several major projects is about one third of that of the preliminary design. It is estimated that the project cost will be reduced by at least RMB 570,000.