论文部分内容阅读
高温季节,混凝土施工的温控措施是:尽可能采用水化热较低的水泥;尽可能降低胶疑材料的用量;加大混凝土的浇筑强度;加强混凝土施工各环节的温控工作;埋设冷却水管。
High temperature season, concrete construction temperature control measures are: as far as possible the use of low hydration heat cement; as much as possible to reduce the amount of plastic materials suspected; increase the pouring strength of concrete; strengthen the concrete construction of various aspects of temperature control work; buried cooling Water pipe.