南水北调工程具有点多、线长、建设时间跨度大的特点,不仅涉及直管、委托及代建三种管理模式,而且涉及不同投资主体、不同设计单位以及面对不同地方群体等多种利益关系。因此,南水北调工程建设管理复杂困难,而且工程投资控制压力极大。为较好地实现投资控制目标,有必要对目前投资控制存在的问题进行研究探讨,以期寻找投资控制的措施和应对策略。
The South-to-North Water Diversion Project has the characteristics of more points, longer lines and longer construction time span. It involves not only three types of management modes: direct management, entrustment and agency construction, but also various interests such as different investors, different design units and different local groups . Therefore, the construction of South-North Water Diversion Project is complicated and difficult to manage, and the project investment control pressure is extremely high. In order to achieve the goal of investment control well, it is necessary to study the existing problems of investment control in order to find the investment control measures and coping strategies.