随着科学技术和工业的高速发展,企业的生产技术装备在质和量的两个方面都出现了巨大的变化,特别对于象我们株洲冶炼厂这样一个流程性极强的有色冶炼企业,更是如此。在连续性生产中,一台设备、一套装置、一条管线乃至一个阀门、一个接头发生故障都会造成全系统的停产。由于各生产系统的自动化、技术复杂化、设备的大型化和超小型化,以及我厂特定的高温、高酸、强碱、烟尘的腐蚀磨损,更加大了我厂设备管理的难度。为了适应国家经济建设的发展,也为了株洲冶炼厂能立于不败之地,迫使我们转变设备管理观念。通过前几年开展设备创优工作以及设备故障统计分析的反思,1990年底我们提出了“保流程畅通”的设备管理观念,各项管理工作向主流程倾斜,并制订了“围绕生产流程,深化设备管理,降低系统故障,保证流程畅通”的设备管理方针。 1.建立适合我厂实际的点检模式 1986年开展了对21种71台A类设备及部分关键设备的三级点检,经过5年的努力,我们确立了分厂点检员定编在生产工段的模式并加以推广,发挥了操检合一的作用,协调了生产与设备的关系。动力分厂由于点检工作开展得深入扎实,设备状况进一步改善,故障率大幅度降低。目前,该分厂已取消了钳、电工的夜间值班。
With the rapid development of science and technology and industry, the production technology and equipment of enterprises have undergone tremendous changes in both quality and quantity, especially for a non-ferrous smelting enterprise like Zhuzhou Smelter which is extremely process-oriented in this way. In continuous production, a piece of equipment, a set of equipment, a pipeline and even a valve, a joint failure will result in system-wide shutdown. Due to the automation of the production system, technical complexity, equipment, large-scale and ultra-miniaturization, as well as our factory-specific high temperature, high acid, alkali, smoke and dust corrosion and wear and tear, more greatly I plant the difficulty of equipment management. In order to adapt to the development of national economic construction, but also to Zhuzhou smelter invincible, forcing us to change the concept of equipment management. Through a few years ago to carry out equipment excellence work and equipment failure statistical analysis of reflection, the end of 1990 we put forward the “Paul flow smooth” equipment management concept, the management of the tilt to the main process and developed “around the production process, deepen Equipment management, reduce system failure, to ensure smooth flow of ”equipment management guidelines. 1. The establishment of the appropriate inspection model for our plant In 1986 carried out on 21 kinds of 71 Class A equipment and some key equipment of the three-point inspection, after 5 years of efforts, we established a branch inspector scheduled in the production Section of the model and to be promoted to play a role in the unity of the inspection, coordination of the relationship between production and equipment. As a result of the inspection work, the power plant has been in-depth and in-depth, the equipment status has been further improved, and the failure rate has been greatly reduced. At present, the branch has canceled the clamp, electrician night duty.