武钢第三烧结车间拥有4台90米~2烧结机,1973年建成,一次投产成功,生产运行稳定,各项生产技术经济指标良好。曾得到国家建委、冶金部和湖北省委的表扬。多年来,长沙矿山设计院和武钢提出过各种设想和设计、大部分正在变为现实,个别还处于方案研究阶段。本文就七十年代的设计体会及八十年代的改造进行简介与探讨。
The third sintering workshop of WISCO owns 4 sets of sintering machines of 90m ~ 2 and was completed in 1973. The first sintering plant has been successfully put into production and the operation of the production has been stable with good technical and economic indicators. Have been state Construction Commission, Ministry of Metallurgical and Hubei provincial recognition. Over the years, Changsha Mining Design Institute and Wuhan Iron and Steel proposed a variety of ideas and designs, most are becoming a reality, some are still in the program research stage. This article introduces the design experience in the seventies and the transformation in the 1980s.