龚嘴水电站系大渡河中下游第一期开发工程。于1966年1月选定坝址,次年经国家批准按“高坝设计、低坝施工”的原则设计。低坝抬高水位50米,装机七台共70万千瓦,保证出力17.9万千瓦,年发电量34.18亿度。工程除满足发电要求外,尚需解决木材流送过坝问题,在水库进行日调节时,还应考虑流量变化对下游航运的影响。 水工枢纽工程分地下和地面两部分。其中地面工程由混凝土重力坝(包括溢洪道、冲砂底孔、漂木道和厂房进水口等坝段)及坝后式地面厂房组成。最大坝高85米,坝顶全长447米。
Gongzui Hydropower Station Dadu River middle and lower reaches of the first phase of development projects. Selected in January 1966 dam, the following year by the state approved by “high dam design, low dam construction” principle design. Low dam elevation of 50 meters, installed a total of seven 700,000 kilowatts, to ensure that the output of 179,000 kilowatts, the annual generating capacity of 3.418 billion degrees. In addition to satisfying the requirements of power generation, the project still needs to solve the problem of wood flowing through the dam. When adjusting the reservoir on a daily basis, the impact of the traffic flow on downstream shipping should also be considered. Hydro-junction project sub-ground and ground two parts. Among them, the ground works are composed of concrete gravity dam (including spillway, red sand bottom hole, drift wood road and factory inlet, etc.) and dam-style ground floor. The maximum height of 85 meters dam, dam total length of 447 meters.