大跃进以来苏州地区负荷由13,000瓩上升到20,860瓩。一年中上涨的负荷就相当于第一个五年计划期间增加负荷量的3.3倍,出现了电力供不应求的紧张局面。但是,他们在党的领导下,千方百计地挖掘各方面的潜力,积极地开展群众性的调整负荷节约用电工作,获得了显著成绩,共挖掘电力3,500珏,相当于增加了地区供电能力17%,满足了苏州地区工业发展的用电需要。
Since the Great Leap Forward, the load in Suzhou has increased from 13,000 to 20,860. The increase in load during the year is equivalent to 3.3 times the increase in load during the first five-year plan, and there is a tension in the supply of electricity. However, under the leadership of the Party, they tried every possible way to tap the potential in all aspects and actively carried out mass adjustments to load and power conservation work. They achieved remarkable results. A total of 3,500 baht of power was tapped, which was equivalent to an increase of 17% in regional power supply capacity. To meet the electricity needs of industrial development in Suzhou.