LM-5 Integrated Modal Test Completed

来源 :Aerospace China | 被引量 : 0次 | 上传用户:vvchan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The LM-5 integrated modal test was completed at the CALT next-generation launch vehicle industrial base in Tianjin.After 640 days’effort,the LM-5 rocket successively accomplished tests totalling23 technical states such as second-stage flight,first-stage flight,and rocket flight.The data obtained from the tests provided an important basis for rocket dynamic modal correction and the attitude control system.To fully test whether all performance indexes of the LM-5 rocket meet the requirement,the LM-5 rocket began The LM-5 integrated modal test was completed at the CALT next-generation launch vehicle industrial base in Tianjin. After 640 days’ffff, the LM-5 rocket successfully accomplished tests totalling23 technical states such as second-stage flight, first-stage flight , and rocket flight. The data obtained from the tests provided an important basis for rocket dynamic modal correction and the attitude control system. To fully test whether all performance indexes of the LM-5 rocket meet the requirement, the LM-5 rocket began
其他文献
期刊
1 前言《压力容器缺陷评定规范》应用于在役压力容器,是卓有成效的,该《规范》不仅为许多不必要修复缺陷的存在提供了科学的依据,节省了大量的人力、物力和财力,而且又确保
城市给排水管道工程具有工程隐蔽性,受荷载条件的不明确性、埋设环境的影响使地下给排水管道工程的结构安全检测工作不易开展.作者结合多年来的工作经验,总结了适用于地下给
对于混凝土主体结构的建筑物,因为时间原因会出现破损,混凝土材料的强度也会出现劣化,影响结构的安全性.为保证安全使用,对结构构件的表现质量、裂缝、混凝土碳化深度、抗压
本文作者结合自身经验,介绍了现阶段建筑业在安全事故方面的现状,并提出了建筑施工现场安全监督管理需要的有效性的评审,以及检查阶段、施工现场预防安全风险的方法,以供参考
1~2月份港口生产经营情况受当前的金融危机风暴的影响,货物吞吐量、外贸吞吐量、集装箱吞吐量等主要经济指标同比仍明显有下降.
针对石油化工企业的发展,本文首先提出了石油化工企业安全管理中存在的三点问题,分别为:缺乏安全意识、安全隐患相对较为分散以及安全管理缺乏先进性,其次提出了石油化工企业
期刊
2019年11月21-22日,中国集成电路设计业2019年会暨南京集成电路产业创新发展高峰论坛在南京国际会展中心召开.年会期间,主办方协同国际固态电路会议(ISSCC)远东技术委员会举
期刊