论文部分内容阅读
结合云南实际,探讨了生产建设项目水土保持方案编制中存在的水土保持措施设计过于笼统、操作性不强、缺乏针对性,独立费用的计列不规范、标准不统一等问题,并提出了在方案编制中要贯彻水土保持新理念,推行新措施、新设计等建议。
Based on the actual situation in Yunnan, this paper discussed the problems that the design of soil and water conservation measures in production and construction projects are too general, the operation is not strong, the lack of pertinence, the non-standard calculation of independent cost, the standard is not uniform, Proposals to implement the new concept of soil and water conservation, the implementation of new measures, new design and other proposals.