论文部分内容阅读
四川三峡电力(集团)股份有限公司是由原万县市电力总公司、小江水力发电厂——两家市属骨干企业合并改组,并与市水电建筑勘察设计研究院、建筑勘察基础工程公司共同发起设立的定向募集股份制企业。公司地处三峡库区腹地万县市,1993年d月正式申报,1994年3月召开创立大会,成为三峡库区地方电力首家股份制企业。公司总股本1.08亿元人民币,其中国家、法人、个人股分别占58.21%、39.29%、2.5%,现装机6.36万千瓦,年售电量3.1亿千瓦时。
Sichuan Sanxia Electric Power (Group) Co., Ltd. was merged from the former Wanxian Electric Power Corporation and the Xiaojiang Hydroelectric Power Plant, two key city enterprises, and was merged with the municipal hydropower construction survey and design institute and construction survey infrastructure company. Jointly initiated the establishment of targeted companies to raise joint-stock companies. The company is located in Wanxian City, the hinterland of the Three Gorges reservoir area. It was formally reported in the month of 1993 and was held in March 1994. It became the first joint-stock enterprise of local power in the Three Gorges reservoir area. The total share capital of the company is 108 million yuan, among which 58.21% are for the country, 39.29% for the legal person, and 2.5% for the individual share. The current installed capacity is 63,600 kilowatts and the annual sales volume is 310 million kwh.