雪峰山隧道采用全断面掘进方式施工,充分利用了自行式液压整体衬砌台车,多悬臂钻孔台车等机械化配套设施,施工进度快, 2005年4月成洞258.6m。本文介绍了其施工方案、施工装备、施工方法及现场组织管理手段,并探讨了长大隧道快速施工的有效途径。
Xuefeng Mountain tunnel construction using full face tunneling, full use of the self-hydraulic jackets, multi-cantilevered drilling vehicles and other mechanized facilities, construction progress quickly, in April 2005 a hole 258.6m. This paper introduces its construction plan, construction equipment, construction methods and on-site organization and management tools, and discusses the effective ways of rapid construction of long tunnels.