坝体削坡是土石坝工程施工中重要的工序。预留削坡余量是保证坝体坡面压实质量的一种有效施工方法。削坡余量主要视坝坡坡度、铺料厚度而定,另外也受到回填料的特性和所用施工机械性能的影响。削坡余量的预留决定坝体削坡的施工进度和质量,并最终影响工程效益。那么在坝体削坡施工中如何合理地预留削坡余量呢?笔者结合白龟山水库除险加固工程坝体削坡的实践,提出以下几点 Dam body slope cutting is an important process in earth-rock dam construction. Reserving the slope cut margin is an effective construction method to ensure the compaction quality of the dam slope. The margin of cut mainly depends on the grade of the slope and the thickness of the paving materials. In addition, it is also affected by the characteristics of the backfilling material and the mechanical properties used. The reserve for cutting slope margin determines the construction progress and quality of dam slope cutting and ultimately affects the project benefits. So how to rationally reserve the slope cut allowance in the construction of the slope cutting? In the light of the practice of Baimaishan Reservoir reinforcement and reinforcement of the dam, it puts forward the following points
其他文献
1 史灌河的基本情况史灌河是纵贯固始县全境的主要河流,由史河与灌河汇集而成,是淮河南岸一条最大支流,在固始县境内集水面积为2443km~2,占全县总面积的83.9%。史河发源于安
2002年4月12日,湖北省科技厅在宜昌市组织召开了由国电自动化研究院和葛洲坝水力发电厂合作开发的“SJ-600型智能分布式现地控制装置”和“SJ-12型双微机自动准同期装置”成
“小区是我家,居民要爱它”的横幅就挂在辽宁锦州城南社区“中老年读书阅览室”的墙上。我有事没事就过去看看书报,和社区的工作人员混得很熟。2009年的一天,我在阅览室看报,
加拿大魁北克省的圣玛格丽特3号(简称圣玛3号)电站的整个研究、设计和施工过程实施了一套水电生态环保方案。兴建一座电站,不可避免地会造成对环境的负面影响,但是,如果措施
1 引言水库进入汛期,各项工作唯防汛马首是瞻。在严格贯彻执行“安全第一、常备不懈,以防为主、全力抢险”方针,认清形势,克服麻痹思想,在做到宁可百年无汛、不可一日不防的
浙江广厦建筑集团公司是以建筑业为主体的股份制企业,也是省百家现代企业制度试点单位之一。集团公司党委针对建筑施工企业点多面广、人员分散、流动频繁的特点,经过探索实
设计以加热炉为研究对象,通过工业组态软件开发实现工业生产的加热炉流程和友好的人机交互界面,实现温度和液位信号的采样、控制和数据显示。形成一套基于组态技术的加热炉温
随着矿业公司采矿单位生产能力的逐渐增加,铁路运输能力也必须提高。但是由于铁路运输设备的逐渐老化,尤其是铁路线路“先天不足,后天失修”的这一基本现状,严重制约着铁运处
对目前高校图书馆的馆藏信息进行了分析,论述了建设资源共享体系的必要性和迫切性,提出了高校图书馆资源共享的基本策略。 The current university library collection info
我在美国俄勒冈州留学期间曾多次去图书馆,那里的优质服务给我留下了很深的印象。在美国俄勒冈州的各类图书馆里,一般都能在阅览室中央或楼层出入口等突显位置看到咨询台,咨