论文部分内容阅读
本文以大量实例对机械工程引进项目可行性研究的失误原因做了分析;介绍了可行性研究中的静-动态经济分析方法并对国外通用的IRR法、NPV法及B/C法的适用性以及国际上流行的可行性研究中两种体系进行了评价,进而提出可行性建议。
This article analyzes the reasons for the failure of the feasibility study of the imported project of mechanical engineering with a large number of examples. It introduces the static-dynamic economic analysis method in the feasibility study and the applicability of the general IRR method, NPV method and B/C method in foreign countries. As well as the internationally popular feasibility studies, two systems have been evaluated and suggestions for feasibility have been put forward.