去年三月,在大学解放军和大庆经验中,根据部、局加强设备管理的指示,结合学习四平标准化变电所工作经验,在市电业局的具体帮助和指导下,我厂第一变电所开展了思想革命化、设备标准化、管理科学化、运行经济化的“四化”活动。经过几个月的艰苦奋斗,变电所大大改观,职工的精神面貌也为之一新,基本上达到了“四化”的要求,更好地适应了玻璃生产的需要。
In March of last year, in the PLA University and Daqing experience, according to instructions from the Ministry and the Bureau to strengthen equipment management, combined with the work experience of learning Siping’s standardized substation, under the specific help and guidance of the Municipal Electric Power Bureau, our factory was transformed into the first power station. The “four modernization” activities have been carried out with the revolutionization of ideas, standardization of equipment, scientific management, and economic operation. After several months of hard work, substations were greatly changed, and the mental outlook of employees was also new. They basically met the requirements of “four modernizations” and better adapted to the needs of glass production.