论文部分内容阅读
工程结合施工现场实际环境和大体积混凝土结构体量特点,采取相应的施工措施和方法,降低大体积混凝土中心温度,控制内外温差和预防收缩缝,取得较好效果。
In combination with the actual environment of the construction site and the volume characteristics of mass concrete structures, the project adopts corresponding construction measures and methods to reduce the center temperature of mass concrete, control the temperature difference between inside and outside and prevent the shrinkage cracks and achieve better results.